01.1 / Map views
A campus map with more than one way to look
Switch between 2D and 3D, then choose Satellite, Default, or Terrain. Building labels provide recognizable destinations across the campus, while the minimap keeps the wider area in view.
Selected work / Maps & spatial experiences
I build interactive maps across my projects. This collection brings them together: campus wayfinding, infrastructure simulations, wildfire analysis, 3D urban design, and mining infrastructure planning.
01 / Campus systems
A connected map experience, from choosing a building to following a route and exploring an infrastructure scenario.
Unreal Engine · Cesium · ArcGIS Pro
I initiated the project and lead its development and technical integration alongside a growing team. I remain directly involved in building the platform, including its campus maps, wayfinding, and simulation interfaces.
01.1 / Map views
Switch between 2D and 3D, then choose Satellite, Default, or Terrain. Building labels provide recognizable destinations across the campus, while the minimap keeps the wider area in view.
01.2 / Wayfinding
Search 129 campus buildings and click a destination on the wayfinding map to set a target. The route appears on both the main map and the minimap, then continues as an animated path with direction arrows on the ground in the 3D campus.
Motion connects the map route to the walking experience. A destination marker shows where the path ends.
01.3 / Mapped assets
Select a building to inspect its photograph, construction year, floor area, primary use, and heating or cooling systems, with access to facility information and meter readings.
A see-through ground view exposes buried water and sewer pipes, with available attributes such as diameter, pressure, flow, and velocity attached to the network.
01.4 / Ground monitoring
InSAR displacement data is brought into the campus environment so movement can be explored in relation to buildings, roads, terrain, and subsurface information. Color communicates variation in displacement; the spatial context helps connect a reading to the place it describes.
01.5 / Fire flow and hydrant simulation
The map supports two workflows: analyzing the existing network and simulating proposed changes. Color legends distinguish pipe pressure or velocity, hydrant labels identify water sources, and the minimap keeps the selected area in context.
Analysis / Existing network
Select a building and a fire demand of 1,500, 3,000, or 4,500 GPM. The analysis reports available flow, minimum pressure, selected hydrants, and whether the scenario passes or fails.
Simulation / Proposed network
Add or replace pipes, valves, fittings, and hydrants. Adjust a pipe’s diameter, material, and length, then preview it in 3D. Scenario Layers keeps the proposed changes separate from the existing network.
Animated flames mark the incident, and animated water-flow arrows show direction along the pipes.
01.6 / Wildfire evacuation
The platform connects wildfire evacuation results to a spatial view of Berkeley. Road-network and time-window maps support comparing modeled traffic conditions and communicating where congestion may develop.
02 / Wildfire mapping
A study of the 2018 Camp Fire in Paradise, California, combining satellite imagery, aerial imagery, burn indices, tree detections, and terrain.
ArcGIS · Landsat 8 · NAIP · dNBR
The difference between prefire and postfire Normalized Burn Ratio produces dNBR. A threshold of 0.27 separates moderate-to-high-impact pixels in this study, making the burn scar easier to compare with tree detections and terrain.
A map needs context. Tree detections and burn indices reveal different aspects of fire impact. Comparing downtown and woodland study areas keeps the interpretation tied to vegetation, land cover, and topography.
Project gallery
Additional work in vector layers, raster surfaces, suitability analysis, and thematic mapping.
03 / 3D urban design
A conceptual park design for Los Angeles, built with 3D object feature layers in ArcGIS Pro.
ArcGIS Pro · 3D object feature layers · Solar analysis
Park objects, trees, and buildings are arranged in a 3D scene alongside terrain and access paths. Solar irradiance and accessibility analysis inform the layout, while the scene makes the relationships between planting, buildings, paths, and open space easier to explore.
Scene composition
Different viewpoints show how the park’s objects fit together. The 3D scene supports reviewing the design from above and from within the site.
Analysis to design
Elevation, contours, and solar-analysis layers provide a common geospatial foundation for the park scene.
04 / Mining & infrastructure
Forecast maps that connect where the ground may move, when infrastructure may be affected, and what needs attention across surface facilities and underground mine levels in Papua, Indonesia.
Subsidence forecasts · Infrastructure overlays · Time-based boundaries · Monitoring coverage
As a geotechnical engineer at Freeport-McMoRan, I developed subsidence forecasts and infrastructure impact maps, led the Subsidence and Transition team, and translated the results into planning and mitigation recommendations with engineers and asset owners.
Reading these maps: these are historical forecasts and monitoring maps from the original studies. A year marks a modeled scenario or forecast boundary; it does not mean damage was observed in that year. The examples below retain their original map colors.
Underground mining removes rock from beneath a mountain or an earlier open pit. As mining progresses, the rock above can fracture, cave, and move. When this movement reaches higher workings or the surface, it can cause the ground to settle or collapse. This is subsidence.
Infrastructure sits within that changing landscape: roads, workshops, crushers, electrical facilities, and underground access routes. I overlaid their locations with modeled movement to turn a technical forecast into a practical question: which assets may be affected, and how much time is available to respond?
01 / See the long-term footprint
The 2041 overview separates three modeled zones, from a broader area of influence to fractured ground and a caved zone. These zones describe the forecast ground response. They are different from the Investigate and Exceeding action categories used to review infrastructure.
The broader forecast influence zone.
Source displacement label: 0.05 m.
A higher-impact zone associated with fractured ground.
Source displacement label: 0.2 m.
The most severe of the three modeled zones.
Source displacement label: 2.0 m.
Displacement values reproduce this study’s legend; they are not general damage thresholds for other sites.
At the Grasberg open pit, above the Grasberg Block Cave (GBC) mine, red square markers locate infrastructure. The green, yellow, and red areas show the modeled subsidence impact. Selecting a forecast year makes it easier to see how the footprint changes around the same facilities.
Action category / Lower to moderate impact
When an asset enters the green or yellow forecast area, inspect it for signs such as cracking or slope movement. The review informs whether it can remain in use, needs repair, or should be vacated or dismantled.
Action category / Severe impact
When an asset enters the severe red forecast area, plan to vacate it or dismantle it before the projected impact. The map helps bring that decision forward into infrastructure planning.
The design task: keep asset locations, forecast severity, and forecast year readable together, so a dense engineering model can support a clear next action.
02 / Add the time dimension
Below ground, the same question is mapped against mine workings at a particular level. Colored outlines show the forecast footprint for successive years. If infrastructure lies on or inside a year’s boundary, the model projects that it may be affected by that year.
The two GBC views below show the Investigate and Exceeding boundaries from 2019 to 2030. This separates the time to start checking a facility from the time to plan for severe impact.
| Infrastructure | Investigate forecast | Exceeding forecast |
|---|---|---|
| Kali Corridor · GBC 2850L | 2021 | 2022 |
These are planning milestones from the forecast, not a record of when damage actually occurred.
The GBC undercut map compares slight-to-moderate forecast impact in 2020, 2021, and 2022 against production and office support infrastructure. The outlines and infrastructure annotations below preserve their positions from the source presentation.
| Infrastructure | Forecast year |
|---|---|
| MCM & Redpath Electric | 2021 |
| GBC Shaft Batch Plant level | 2021 |
| Batch plant water tank 2 | 2021 |
| Batch plant silo | 2021 |
| Batch plant rail loop | 2020 |
| Electric Substation Dev Undercut | 2020 |
This map brings the 2020 forecast onto the DOZ haulage level, alongside loading points, electrical facilities, the truck haulage shop, and crushers. 3,076 m is the elevation above sea level, not the depth underground: the mine is inside a mountain.
Quarterly Exceeding boundaries from 2021 Q2 to 2025 Q1 show the projected progression toward the DOZ Intake / Hydro Drift infrastructure. The original review also considered a possible two-quarter delay in impact timing.
| Model forecast | Possible delayed timing |
|---|---|
| 2025 Q1 | 2025 Q3 |
The timing comparison communicates uncertainty; neither date is presented as an observed event.
03 / Check a critical facility
At Ertsberg, above the DOZ and DMLZ mines, the 2020 and 2021 surface scenarios were reviewed against the Ore Flow facility shown at the lower left of each map. In both modeled years, it remained outside the projected subsidence-impact footprint.
This kind of overlay helps planners assess a specific facility in context. It records the conclusion for those forecast scenarios, rather than making a claim about present-day conditions.
04 / Connect the forecast to field checks
A forecast identifies where and when to look. Monitoring provides observations to review alongside it. This February 2020 coverage map shows where different instruments cover the site, supporting inspection and monitoring planning.
Here, color identifies the monitoring system. It does not represent subsidence severity or an infrastructure action category.
Purple
Magenta
Blue
Dark green
Orange
Pink
Robotic total station · Light green
From forecast to decision: locate the infrastructure, compare it with the projected footprint and timing, then review field evidence to plan investigation, repair, relocation, or dismantling.