Selected work / Maps & spatial experiences

Maps made
to be explored.

I build interactive maps across my projects. This collection brings them together: campus wayfinding, infrastructure simulations, wildfire analysis, 3D urban design, and mining infrastructure planning.

Yulia Nugroho · GIS Engineer, UC Berkeley

01 / Campus systems

UC Berkeley
Campus Digital Twin

A connected map experience, from choosing a building to following a route and exploring an infrastructure scenario.

Unreal Engine · Cesium · ArcGIS Pro

My role

I initiated the project and lead its development and technical integration alongside a growing team. I remain directly involved in building the platform, including its campus maps, wayfinding, and simulation interfaces.

See the platform in motion
Campus exploration, wayfinding, monitoring, and infrastructure simulation.
2:37 · No audio

01.1 / Map views

A campus map with more than one way to look

Switch between 2D and 3D, then choose Satellite, Default, or Terrain. Building labels provide recognizable destinations across the campus, while the minimap keeps the wider area in view.

01.2 / Wayfinding

Search, set a target, and follow the path

Search 129 campus buildings and click a destination on the wayfinding map to set a target. The route appears on both the main map and the minimap, then continues as an animated path with direction arrows on the ground in the 3D campus.

Motion connects the map route to the walking experience. A destination marker shows where the path ends.

01.3 / Mapped assets

Open the information behind a location

Select a building to inspect its photograph, construction year, floor area, primary use, and heating or cooling systems, with access to facility information and meter readings.

Reveal the infrastructure below the surface

A see-through ground view exposes buried water and sewer pipes, with available attributes such as diameter, pressure, flow, and velocity attached to the network.

A see-through ground view reveals the utility network

01.4 / Ground monitoring

Explore displacement in its physical context

InSAR displacement data is brought into the campus environment so movement can be explored in relation to buildings, roads, terrain, and subsurface information. Color communicates variation in displacement; the spatial context helps connect a reading to the place it describes.

01.5 / Fire flow and hydrant simulation

Read the network. Then test a change.

The map supports two workflows: analyzing the existing network and simulating proposed changes. Color legends distinguish pipe pressure or velocity, hydrant labels identify water sources, and the minimap keeps the selected area in context.

Analysis / Existing network

Check capacity around a building

Select a building and a fire demand of 1,500, 3,000, or 4,500 GPM. The analysis reports available flow, minimum pressure, selected hydrants, and whether the scenario passes or fails.

Analysis · existing network, selected hydrants, and pressure results

Simulation / Proposed network

Compare possible network upgrades

Add or replace pipes, valves, fittings, and hydrants. Adjust a pipe’s diameter, material, and length, then preview it in 3D. Scenario Layers keeps the proposed changes separate from the existing network.

Simulation · proposed components and a 16-inch replacement preview

Animated flames mark the incident, and animated water-flow arrows show direction along the pipes.

01.6 / Wildfire evacuation

See how a traffic scenario develops across the road network

The platform connects wildfire evacuation results to a spatial view of Berkeley. Road-network and time-window maps support comparing modeled traffic conditions and communicating where congestion may develop.

Road-network visualization for wildfire evacuation scenarios

02 / Wildfire mapping

Mapping burn severity
with dNBR

A study of the 2018 Camp Fire in Paradise, California, combining satellite imagery, aerial imagery, burn indices, tree detections, and terrain.

ArcGIS · Landsat 8 · NAIP · dNBR

Turn imagery into a map of change

The difference between prefire and postfire Normalized Burn Ratio produces dNBR. A threshold of 0.27 separates moderate-to-high-impact pixels in this study, making the burn scar easier to compare with tree detections and terrain.

A map needs context. Tree detections and burn indices reveal different aspects of fire impact. Comparing downtown and woodland study areas keeps the interpretation tied to vegetation, land cover, and topography.

03 / 3D urban design

A park designed
in a geospatial scene

A conceptual park design for Los Angeles, built with 3D object feature layers in ArcGIS Pro.

ArcGIS Pro · 3D object feature layers · Solar analysis

Place objects within a real spatial framework

Park objects, trees, and buildings are arranged in a 3D scene alongside terrain and access paths. Solar irradiance and accessibility analysis inform the layout, while the scene makes the relationships between planting, buildings, paths, and open space easier to explore.

Solar-analysis view of the conceptual park

Scene composition

From individual features to a landscape

Different viewpoints show how the park’s objects fit together. The 3D scene supports reviewing the design from above and from within the site.

Analysis to design

Keep the design connected to terrain and sunlight

Elevation, contours, and solar-analysis layers provide a common geospatial foundation for the park scene.

Terrain, contours, and solar-analysis layers used in the design workflow

04 / Mining & infrastructure

Mapping ground movement.
Planning what comes next.

Forecast maps that connect where the ground may move, when infrastructure may be affected, and what needs attention across surface facilities and underground mine levels in Papua, Indonesia.

Subsidence forecasts · Infrastructure overlays · Time-based boundaries · Monitoring coverage

My role

As a geotechnical engineer at Freeport-McMoRan, I developed subsidence forecasts and infrastructure impact maps, led the Subsidence and Transition team, and translated the results into planning and mitigation recommendations with engineers and asset owners.

Reading these maps: these are historical forecasts and monitoring maps from the original studies. A year marks a modeled scenario or forecast boundary; it does not mean damage was observed in that year. The examples below retain their original map colors.

What happens above an underground mine?

Underground mining removes rock from beneath a mountain or an earlier open pit. As mining progresses, the rock above can fracture, cave, and move. When this movement reaches higher workings or the surface, it can cause the ground to settle or collapse. This is subsidence.

Infrastructure sits within that changing landscape: roads, workshops, crushers, electrical facilities, and underground access routes. I overlaid their locations with modeled movement to turn a technical forecast into a practical question: which assets may be affected, and how much time is available to respond?

01 / See the long-term footprint

Start with where the ground may move

The 2041 overview separates three modeled zones, from a broader area of influence to fractured ground and a caved zone. These zones describe the forecast ground response. They are different from the Investigate and Exceeding action categories used to review infrastructure.

2041 subsidence-zone overview. Colored zones show the modeled ground response; blue points locate infrastructure in this map.

Influence zone

The broader forecast influence zone.
Source displacement label: 0.05 m.

Fractured zone

A higher-impact zone associated with fractured ground.
Source displacement label: 0.2 m.

Caved zone

The most severe of the three modeled zones.
Source displacement label: 2.0 m.

Displacement values reproduce this study’s legend; they are not general damage thresholds for other sites.

Then bring the infrastructure into view

At the Grasberg open pit, above the Grasberg Block Cave (GBC) mine, red square markers locate infrastructure. The green, yellow, and red areas show the modeled subsidence impact. Selecting a forecast year makes it easier to see how the footprint changes around the same facilities.

Choose a forecast snapshot
Grasberg surface infrastructure · 2020 forecast snapshot. Red squares locate infrastructure; colored areas show modeled subsidence impact.

Action category / Lower to moderate impact

Investigate

When an asset enters the green or yellow forecast area, inspect it for signs such as cracking or slope movement. The review informs whether it can remain in use, needs repair, or should be vacated or dismantled.

Action category / Severe impact

Exceeding

When an asset enters the severe red forecast area, plan to vacate it or dismantle it before the projected impact. The map helps bring that decision forward into infrastructure planning.

The design task: keep asset locations, forecast severity, and forecast year readable together, so a dense engineering model can support a clear next action.

02 / Add the time dimension

Which underground facilities may be reached—and when?

Below ground, the same question is mapped against mine workings at a particular level. Colored outlines show the forecast footprint for successive years. If infrastructure lies on or inside a year’s boundary, the model projects that it may be affected by that year.

The two GBC views below show the Investigate and Exceeding boundaries from 2019 to 2030. This separates the time to start checking a facility from the time to plan for severe impact.

Choose the action category · GBC 2850L
GBC underground infrastructure at 2850L · Investigate forecast boundaries, 2019–2030. Each colored contour is labeled by its forecast year.

One example from the original GBC infrastructure review
InfrastructureInvestigate forecastExceeding forecast
Kali Corridor · GBC 2850L20212022

These are planning milestones from the forecast, not a record of when damage actually occurred.

GBC undercut · Which facilities intersect the 2020–2022 footprint?

The GBC undercut map compares slight-to-moderate forecast impact in 2020, 2021, and 2022 against production and office support infrastructure. The outlines and infrastructure annotations below preserve their positions from the source presentation.

GBC undercut at 2850L · 2020–2022 forecast contours with the original production and office-support infrastructure outlines.
2020 contour2021 contour2022 contourProduction supportOffice support
Facilities listed in the source impact review
InfrastructureForecast year
MCM & Redpath Electric2021
GBC Shaft Batch Plant level2021
Batch plant water tank 22021
Batch plant silo2021
Batch plant rail loop2020
Electric Substation Dev Undercut2020
DOZ haulage · A 2020 forecast at 3,076 m above sea level

This map brings the 2020 forecast onto the DOZ haulage level, alongside loading points, electrical facilities, the truck haulage shop, and crushers. 3,076 m is the elevation above sea level, not the depth underground: the mine is inside a mountain.

DOZ haulage level at 3,076 m above sea level · 2020 subsidence forecast. Red location numbers correspond to the infrastructure key.
Read the infrastructure key · 24 locations
  1. Loading Point 25
  2. Loading Point 24
  3. Loading Point 23
  4. Loading Point 22
  5. Loading Point 21
  6. Loading Point 20
  7. Loading Point 19
  8. Loading Point 18
  9. Loading Point 17
  10. Loading Point 16
  11. Loading Point 15
  12. Loading Point 14
  13. Loading Point 13
  14. Loading Point 12
  15. Loading Point 11
  16. Loading Point 10
  17. Loading Point 09
  18. Loading Point 08
  19. Load Center LP24
  20. VCB LP11
  21. Load Center LP8
  22. DOZ Truck Haulage Shop
  23. Crusher 02
  24. Crusher 01
DOZ Intake / Hydro Drift · A quarterly forecast with timing uncertainty

Quarterly Exceeding boundaries from 2021 Q2 to 2025 Q1 show the projected progression toward the DOZ Intake / Hydro Drift infrastructure. The original review also considered a possible two-quarter delay in impact timing.

DOZ Intake / Hydro Drift · Exceeding forecast boundaries, 2021 Q2–2025 Q1. The original review also considered a possible two-quarter delay.
2021 Q22021 Q32021 Q42022 Q12022 Q22022 Q32022 Q42023 Q12024 Q12025 Q1
Hydro Drift timing comparison from the original review
Model forecastPossible delayed timing
2025 Q12025 Q3

The timing comparison communicates uncertainty; neither date is presented as an observed event.

03 / Check a critical facility

The maps also show what stays outside the forecast

At Ertsberg, above the DOZ and DMLZ mines, the 2020 and 2021 surface scenarios were reviewed against the Ore Flow facility shown at the lower left of each map. In both modeled years, it remained outside the projected subsidence-impact footprint.

This kind of overlay helps planners assess a specific facility in context. It records the conclusion for those forecast scenarios, rather than making a claim about present-day conditions.

Compare the Ertsberg forecast years
Ertsberg surface above DOZ and DMLZ · 2020 forecast. The Ore Flow facility shown at the lower left remains outside the projected impact footprint in this scenario.

04 / Connect the forecast to field checks

Where do we have monitoring coverage?

A forecast identifies where and when to look. Monitoring provides observations to review alongside it. This February 2020 coverage map shows where different instruments cover the site, supporting inspection and monitoring planning.

Here, color identifies the monitoring system. It does not represent subsidence severity or an infrastructure action category.

Monitoring coverage as of February 2020. Colors identify instrument coverage, not forecast severity.

PRISM

Purple

GPS

Magenta

VZW piezometers

Blue

IBIS radar

Dark green

SSRXT

Orange

Slideminder

Pink

RTS

Robotic total station · Light green

From forecast to decision: locate the infrastructure, compare it with the projected footprint and timing, then review field evidence to plan investigation, repair, relocation, or dismantling.

Project image